Project Description

Travis Electric Company was chosen to be a part of the design and installation team for the SuperVAR project at the Hoeganaes facility. To accommodate this new technology, modifications were required for both the facility and the 161kV substation. The relay mechanisms in the substation were upgraded to achieve compatibility with the new technology of the SuperVAR. An electrical infrastructure was created to connect and support the SuperVAR, along with fiber-optic communications for control and information processing.