IT & Data Projects

Permalink

Codigent IT Project

Codigent IT Project

The need for quality emergency power and an uninterruptible power supply for critical loads demanded an above average power distribution system for this facility. In addition to providing the entire electrical system for this building, including the building power distribution, all lighting, receptacles, fire alarm, etc., a 500 kW emergency generator, 3000 amp […]

Permalink Gallery

First Tennessee Banks

First Tennessee Banks

Travis performed IT/Data cabling installations for multiple First Tennessee Bank locations in the Nashville area.

Permalink

Deloitte & Touche IT Project

Deloitte & Touche IT Project

Travis Electric Company exclusively provides Deloitte & Touche with all network-cabling needs. We provide and custom install CAT5, CAT6, and fiber within the data center as well as their office and cubical environments. On-site custom fiber terminations are performed due to the ever-changing data center environment. Due to the critical nature […]

Permalink

Suntrust IT Project

Suntrust IT Project

Travis Electric Company provides custom network cabling services to meet the needs of the operations and service center of SunTrust Bank. Whether it is telephone or network cabling, Travis Electric continues to maintain and improve the ever changing cubicle and office environment of the SunTrust facility.

Permalink

CHD Merdian IT Project

CHD Merdian IT Project

Travis Electric Company provided all of the cabling needs for this project from the ground up. Travis Electric installed and terminated all network, voice over IP, and phone cabling as well as terminating all connections from the cubical and office back to the data center. Travis Electric continues to meet all client cabling needs […]

Permalink

Deloitte 3

Deloitte 3

Increased power needs in the Computer/Communications Room were solved with the addition of a new 500 kW uninterruptible power supply (UPS), and replacing the existing 2000 amp main switchboard with a 3000 amp switchboard. Included in this project was the replacement of five existing automatic transfer switches (ATSs) with five new ASCO brand ATSs […]

Permalink

Deloitte 2

Deloitte 2

Due to the extremely critical nature of the computer data stored and processed at this facility, redundant circuits to all branch loads in the data processing facility was required. This was accomplished by installing new transformers and panelboards to replace existing power distribution units. Transformers are K13-rated and panelboards are rated for non-linear loads. […]

Permalink

Deloitte 1

Deloitte 1

Due to the critical nature of the computer data stored and processed at this facility, an upgrade of the existing emergency power and uninterruptible power systems was desired. The existing 200 kW and 125 kW uninterruptible power supplies (UPSs) were replaced with two new 500 kW UPSs. A 900 kW was added to back […]

Permalink

CHD Meridian Healthcare

CHD Meridian Healthcare

This facility desired redundant power feeds to all computer equipment due to the critical nature of their data processing functions. In addition to the existing power distribution system, which included an emergency generator and uninterruptible power supply (UPS), a new 150 kW UPS and 250 kW emergency generator system and automatic transfer switch were […]

Permalink

Caterpillar Financial Data Center

Caterpillar Financial Data Center

Due to the critical nature of data processing at this facility, a completely redundant electrical system for the data processing equipment was required.  A second 1200 amp utility service to the building was installed with a second set of distribution panels. Once these were in place, two of the existing four power distribution units […]